TerraFirm Pro Retaining Wall Panels for Toowoomba Council Corridor Upgrade

23 September 2020

A key infrastructure project for Toowoomba Regional Council required an innovative retaining wall design that overcame highly limiting site conditions; our revolutionary TerraFirm retaining wall panels were the only product on the market that fit the brief.

 

TerraFirm Retaining Wall Panels for Toowoomba Council | ModularWalls TerraFirm Retaining Wall Panels for Toowoomba Council | ModularWalls
TerraFirm Retaining Wall Panels for Toowoomba Council | ModularWalls TerraFirm Retaining Wall Panels for Toowoomba Council | ModularWalls
TerraFirm Retaining Wall Panels for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls TerraFirm Retaining Wall Panels for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls
TerraFirm Retaining Wall for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls TerraFirm Retaining Wall for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls
TerraFirm Retaining Panels for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls TerraFirm Retaining Panels for Griffith Street Corridor Upgrade, Toowoomba | ModularWalls
TerraFirm Retaining Wall Panels for Griffith Street Corridor Upgrade, Toowoomba Council | ModularWalls TerraFirm Retaining Wall Panels for Griffith Street Corridor Upgrade, Toowoomba Council | ModularWalls

 

Griffiths Street Corridor Upgrade

The Griffiths Street Corridor Upgrade was part of the $1.6 billion Second Range Crossing project,  jointly funded by the Australian and Queensland governments. Being a key milestone for the larger infrastructure project, Griffiths Street provided a vital link to the New England Highway at Harlaxton, supporting the construction of a bypass to the north of Toowoomba.

 

“This upgrade is an important piece in the delivery of the Toowoomba Second Range Crossing and another example of all levels of government working together to deliver significant infrastructure for the Toowoomba region.”

                   – Hon Scott Buchholz MP, Assistant Minister for Roads and Transport (source)

 

The upgrades to Griffiths Street included new underground drainage and a widening of the road. The project also included landscaping works, to ensure the final aesthetic was in keeping with the local community setting.

However, these upgrades significantly reduced the space between the road and private properties. This resulted in insufficient room for a traditional block retaining wall and footing design, without either resuming or purchasing land from neighbouring residents.

Furthermore, underground services restricted most other retaining wall options, requiring a lightweight design with minimal footing requirements.

TerraFirm Retaining Wall Panels | ModularWalls

TerraFirm retaining panels only solution to meet full design brief

Fortuitously for the client, the modular design and simplicity of the TerraFirm Pro retaining panels overcame every single challenge. In fact, Terrafirm Pro was the only solution available that met the design brief and fit the unique site conditions.

Ranging between 900-1200mm high, the TerraFirm Pro retaining panels provided a sleek, sophisticated retaining solution that combined strength, durability and harmonious aesthetics. Utilising 100UC14.8 galvanised steel posts, the wall was easily constructed around the existing underground cabling.

The final solution ran approx. 90m in length, incorporating returns for private driveway access. Expertly installed by Queensland Commercial Walls, the walls were installed, waterproofed and finished in just 4 days. The finished aesthetic exceeded community expectations, accentuating the surrounding natural landscapes and following the gentle undulation of the land.

***